Airport Munich GmbH
Back to the projectsProject
Earth-masses concept for a logistically optimized solution especially designed for the third runway of the Munich´s airport.
Client
Airport Munich GmbH
Project duration
2012
Brief description
As part of the earthwork for the 3rd runway a total of 5.5 million m³ of earth masses were moved in about 30 different soil classes.
By logistic optimization in the planning the large number of soil classes was reduced to a few categories in order to achieve a feasible concept.
Due to a temporal analysis and a optimization of the flow of materials, the reuse of the soil could be maximized and the intermediate storage as well as the transport routes could be minimized.