Deutsche Bank AG, bauserve GmbH
Back to the projectsProject
Planning of the site logistics for the renovation of the Deutsche Bank twin-towers.
Client
Deutsche Bank AG, bauserve GmbH
Project duration
2007 - 2008
Brief description
For the renovation of the office towers, located at the city centre, a site logistics concept was required, which considered the bottleneck of small, rare free space and poor access to the buildings. Due to the very limited possibilities of a vertical transport, the site logistics had a central interface role for all assembly sections.
The present infrastructure had to be analysed and integrated into scheduled quantity structures and work flow charts. For the controlling and coordination during the construction phase, a specified manual for the operative logistics service provider was developed as a basis for the logistical processes.