ThyssenKrupp Transrapid GmbH

Back to the projects

Project

Site logistics concept and implementation of the specific technical facilities for the maglev train in Shanghai

Client

ThyssenKrupp Transrapid GmbH

Project duration

2002 - 2003

Brief description

On preparation of the realization of the maglev project in Shanghai, there was required a specific site logistics concept, that was adapted to the local conditions.

This had to be performed under inclusion of the Thyssen-specific quality management regulations.

During the implementation a permanent project management including reporting system was established.

Back to the projects