ThyssenKrupp Transrapid GmbH
Back to the projectsProject
Site logistics concept and implementation of the specific technical facilities for the maglev train in Shanghai
Client
ThyssenKrupp Transrapid GmbH
Project duration
2002 - 2003
Brief description
On preparation of the realization of the maglev project in Shanghai, there was required a specific site logistics concept, that was adapted to the local conditions.
This had to be performed under inclusion of the Thyssen-specific quality management regulations.
During the implementation a permanent project management including reporting system was established.